Wall Painting Work at G/F and 1/F (15 May – 21 May 2019)

Wall painting work will be carried out as scheduled below:

Work Period Location
15 May – 18 May 2019 G/F Lobby and Corridor areas
20 May – 21 May 2019 L115 near entrance at back staircase
L114 near goods lift
L114 near Core E exit

Paint smell may be emitted during the work period.
We apologize for any inconvenience caused.

  • Notice