Wall painting work will be carried out as scheduled below:
Work Period | Location |
---|---|
15 May – 18 May 2019 | G/F Lobby and Corridor areas |
20 May – 21 May 2019 | L115 near entrance at back staircase L114 near goods lift L114 near Core E exit |
Paint smell may be emitted during the work period.
We apologize for any inconvenience caused.
- Notice